Construct the light well point pipe after completion the east two-line side piling, to prevent the pipe movement or damage by soil pressure during piling.
英
美
释义
轻型井点管应在东侧的两排边桩施工完毕后方可施工;防止压桩过程中;土的挤压力使井管位移或损坏井管.