Considering the hydrogeologic factors in Beiyishui invert siphon project, the flow diversion strocture is laid out in 2 phases and the fully enclosed cofferdam is adopted.
英
美
释义
摘要根据实际情况将导流建筑物分二期布置,采用全封闭围堰型式。
把海词放在桌面上,查词最方便
触屏版
|
电脑版
©2003 - 2025 海词词典(Dict.cn)
立即下载