Consider first the boiler plant involved in the cycle. Feed-water is supplied to the boiler drum, where is boiled and converted into dry saturated steam.
英
美
释义
首先考虑在循环中所涉及的锅炉部分。给水被供应给锅炉汽包,在那里给水被煮沸,并转化为干饱和蒸汽。
把海词放在桌面上,查词最方便
触屏版
|
电脑版
©2003 - 2024 海词词典(Dict.cn)
立即下载