And then made simulation of the 135MWe CFB boiler of Xin Xiang power plant with msc2000 and analyzed the simulation result. At last, we put forward a primary design of a 600 MWe supercritical CFB boiler.
英
美
释义
然后,利用该模型,在msc2000仿真平台上对一台135MWe循环流化床锅炉的额定负荷工况、变负荷工况、变过量空气系数和变二次风率等工况进行仿真,并对仿真结果进行了分析。
把海词放在桌面上,查词最方便
触屏版
|
电脑版
©2003 - 2024 海词词典(Dict.cn)
立即下载