According to the laboratory measurements of velocity and water level which were obtained before and after seting up of pile group.
英
美
释义
通过对河道修建高桩码头前、后的流速分布及水位试验分析得出:随着桩群长度的增加,同一根垂线上的流速分布趋于均匀。
把海词放在桌面上,查词最方便
触屏版
|
电脑版
©2003 - 2024 海词词典(Dict.cn)
立即下载