6.After the range is submitted a tender, must want to pay the engineering deposit of 30%, the product is qualifiedly paid off all engineering funds.
英
美
释义
6. 程投标后,必须欲付30%25的工程定金,产品合格付清所有工程款项。
把海词放在桌面上,查词最方便
触屏版
|
电脑版
©2003 - 2024 海词词典(Dict.cn)
立即下载