总承包商应与机电分包商和土建分包商联系核实相应电功率与实际负荷表相符.负荷表数值可能与上述数值有异.
释义
更多
The contractor will liaise with the electromechanical Contractor and the Civil Works Contractor to confirm [red]tile[/red] (THE)appropriate power rating due to the actual load list[red]. [/red]that may be [red]different of [/red](FROM)the value here above.